Status of Grants Projects/3/2006 awarded under Call for Proposals EuropeAid/114189/C/G published on 5 July 2002

Beneficiary:
Name & Address

Action title
(Contract No.)

Action location

Action duration (Months)

Grant amount (EUR)

Status as per 5 September 2006

Regional Institute of Environmental Technology,
PSB Science Park Annex Nr. 04-09,
3, Science Drive
Singapore 118223

Stimulating EU-Indochina new and renewable energy (NRE) projects through private sector participation in economic cooperation and foreign direct investment (FDI) initiatives

(2-2002)

Vietnam, Laos, Cambodia and Singapore

12

98.810
Final:
56,377

Ended 31/05/04. FR approved 3/2/05
Monitored 20/11/2003 and     4-5/03/2004

Bronzeoak
Bronzeoak House, Stafford Road, Caterham Surrey,
CR3 6JG
UK

 

10 MW Riau Palm Oil Residue Power Project
(18-2002)

Indonesia

(12)
13.5

85.413
Final:
81,653.50

Addendum No.1 of 23/04/04 (change of partner), No.2 of 12/05/04 (extension to 13.5 months). Ended 30/06/04, FR approved 16/05/05. Monitored 19/11/2003 and 29/06/04.

Bronzeoak
Bronzeoak House, Stafford Road, Caterham Surrey,
CR3 6JG,
UK

15 MW First Farmers Bagasse Cogeneration project
(20-2002)

Philippines

12

207.403
Final:
183,213.14

Ended 11/05/04, FR approved 01/04/05. Monitored 19/11/2003 and 26-27/02/2004

FICHTNER Gmbh & Co. KG
Sarweystrasse 3
70191 Stuttgart,
Germany

 

Trans-Borneo power grid development concept and energy trading study
(13-2002)

Indonesia, Malaysia, Brunei

(12)
14.5

400.000
Final:
360,585.79

Addendum No. 1 of 08/04/04 (extension to 14.5 months). Ended 31/07/04. FR approved 21/06/05. Monitored  9-10/12/2003 and 07/05/04

Department of Energy Development and Promotion (DEDP)
17 Rama I Road, Kasatsuk Bridge, Yodse, Pathumwan Bangkok 10330,  Thailand

ASEAN-European study tour and regional ASEAN workshops addressing best practices in energy labeling
(23-2002)

Thailand, Singapore and Indonesia

7

76.910
Final:
60,771.52

Ended 29/12/03, FR approved 30/08/05.

ASEAN Council on Petroleum (ASCOPE)
Level 75, Tower 1, Petronas Twin Towers, Kuala Lumpur City Centre,
50088 Kuala Lumpur
Malaysia

ASEAN oil security and emergency preparedness
(7-2002)

ASEAN countries

18

200.000
Final:
168,732.70

Ended 23/12/04.
Draft Intermediate Report 10/12/04. FR 28/10/05, terminated 24/11/05
Monitored 07/04/2004.

Department of Energy of the Republic of the Philippines
Merritt Road, Fort Bonifacio, Taguig,1201,Metro Manila, Philippines

Role of regulators and regulatory frameworks in ASEAN electricity and gas sector reform: a comparative examination of national and regional models
(17-2002)

Philippines

 

24

199.902
Final
106,765.83

Ended 15/07/05.
No Intermediate Report delivered, Final Report appr 25/04/06, waiting repayment
Monitored by EU mon. 04-05/05

ADEME
27 Rue Louis Vicat,
75015 Paris
France

Launching of a EC-ASEAN energy network, Sharing energy policy and implementation experiences among selected countries  (6-2002)

Indonesia, Malaysia, Philippines, Thailand

12

189.353
Final:
61,026

Ended 29/07/04, FR approved 3/2/05.

IED
2, Chemin de la Chauderaie, 69340 Francheville,
France

Rural electrification decentralised energy options - REDEO
(24-2002)

Cambodia, Laos and Vietnam

26

199.749

Ended 29/07/05. FR rcvd 25/11/05 and audit report 24/02/06, under assessment. Monitored 23/11/2003. Intermediate Report 11/04. Monitored by EU mon. 04-05/05


CITELUM
37, Rue De Lyon,
75012 Paris
France

Optimised street lighting in Southeast Asia - a regional approach
(15-2002)

Laos, Thailand and Vietnam

(18)
25

(401.764)
336.472

Ended 7/11/05. FR partly rcvd 27/12/05 and 09/01/06, audit report pending, under assessment. Monitored 8/3/04. Addendum No.1 for partner change, extension and Grant amount change 22/11/04. Monitored by EU mon.04-05/05

Yayasan Pelangi
Jl. Danau Tondano A-4, Pejompongan,
Jakarta 10210
Indonesia

Implementation of the clean development mechanism (CDM) in the ASEAN energy sector, exchanging experiences and regional institutional capacity building (CDM-ASEAN)
(33-2002)

ASEAN Countries

18

199.631

Ended 08/04/05. FR rcvd 31/10/05 and commented, response pending. Intermediate report approved 21/03/05, with comments.
Project monitored 18-19/03/2004 and 21/10/04

Electricite du Cambodge (EDC)
EDC Building, Street 19, Phnom Penh,
Kingdom of Cambodia

Study tour and workshop on power pooling in Europe for the greater Mekong subregion/ASEAN Power interconnection programme
(34-2002)

ASEAN Countries

9

97.467
Final:
89,904.46

Ended 04/04, FR approved 22/03/05.
Monitored 23/11/2003

Electricite du Cambodge (EDC)
EDC Building, Street 19, Phnom Penh,
Kingdom of Cambodia

Capacity building programme for the power industry of Cambodia, Laos, Vietnam and Thailand (CLVT) countries
(25-2002)

Laos, Vietnam and Thailand

12

194.876
Final
166,561.07

Ended 15/10/04, FR  approved 19/04/06. Monitored 23/11/2003 and 18-19/03/2004

Electricite du Cambodge (EDC)
EDC Building, Street 19, Phnom Penh,
Kingdom of Cambodia

The capacity building programme for power transmission system personnel
(26-2002)

Cambodia and Thailand

10

128.411
Final
106,557.96

Ended 15/08/04, FR approved 19/04/06. Monitored 23/11/2003 and 18-19/03/2004

Stockholm Environment Institute
Lilla Nygatan 1, Box 2142,
S-10314 Stockholm,
Sweden

Development of a strategic environmental assessment platform for the regional power sector integration in the lower Mekong countries
(31-2002)

Thailand, Vietnam, Laos, Cambodia,

(18)
(24)
26

(199.675)
197.650

Ended 2/12/05. FR pending Addendum No.1 for study tour to Sweden replace to four regional seminars, No.2/0905 extension to 26 months. Monitored 12/05/04 and 2/8/05

EU Contribution endorsed and contracted 2,879,364 EUR,
Current total update committed EUR 2,375,650.70