Beneficiary: |
Action title |
Action location |
Action duration (Months) |
Grant amount (EUR) |
Percentage of total
eligible action costs (%) |
Projectgesellschaft Solare Energiesysteme
mbH |
Increasing market awareness for building
integrated photovoltaics (BIPV) in Malaysia |
Malaysia |
12 |
(98,265) |
47.00 |
Bronzeoak Limited |
Co-firing Biomass in Existing Coal fired Power Plants in ASEAN Countries (89-2004) |
Vietnam, Indonesia, Philippines |
(10) |
234,706.50 |
50.00 |
Chalmers tekniska högskola AB
|
Analysis of the impact of enhanced use of renewable and advanced fossil fuel technologies for power generation in selected ASEAN countries and development of appropriate policies and institutional frameworks (91-2004) |
Indonesia |
18 |
199,742 |
50.00 |
Environmental Engineering Consultants Co.Ltd
(EEC CO., LTD.) |
Feasibility Study for Sustainable Development
of Samui Island |
Thailand |
18 |
481,793.72 |
50.00 |
Innovation Energie Developpement (IED) |
Distributed Energy: Operational Management
Tools in Cambodia and Laos – DEMT |
Cambodia |
12 + 4 |
196,357.30 |
49.88 |
Equipe Regionale Biomasse Energie (ERBE) |
Developing a National Scheme and Conduct
of Feasibility Studies on the Implementation of Decentralised Energy
Systems using Biomass and/or Indigenous Coal as Fuel in Lao PDR |
Lao PDR |
17 |
298,460 |
49.84 |
Cagayan Electric Power & Light Co.
(CEPALCO) |
Feasibility study for distributed generation
(DG) and renewable energy portfolio (REP) of a distribution utility:
case study in the Philippines |
Philippines |
18 |
497,939 |
50.00 |
The Cambodian Research Centre for Development
(CRCD) |
Feasibility Study of Renewable Energy Options
for Rural Electrification in Cambodia |
Cambodia |
18 |
296,674 |
47.32 |
International Resources Group – Philippines
Inc. |
Increasing access to local sources of financing
(LSF) for renewable energy (RE) investments and design of innovative
financing instruments (IFI): Case study in the Philippines, exchanging
experiences with Thailand, and applicability of European approaches |
Philippines Thailand |
16 |
428,033 |
50 |
Environmental Standards and Systems office |
Enhancing the energy self sufficiency of
rice mills |
Philippines, Malaysia and Thailand |
18 |
395,230 |
49.72 |
Carl Bro International AB |
Master Plan and Feasibility study for the
Implementation of Coal-fired Power Plants in the Philippines |
Philippines |
18 |
485,606 |
49.00 |
Fondation Energies pour le monde (FONDEM) |
Bankable Programs of Renewable Energy sources
for Rural Electrification in Lower Delta Mekong Countries (Delta PRO
RES) |
Cambodia Laos |
20 |
237,480.50 |
50.00 |
Son Vu Company Limited |
Promotion of Private Sector Investment
in Small Hydropower through Financial Support and Capacity Building
for two Feasibility Studies |
Vietnam |
23 |
293,477 |
45.92 |
Soluziona Consultoria y Technologia S.L. |
Feasibility Study for Wind Farms based
in isolated Areas: Case study and Development of a Standard Identification
Methodology |
Indonesia |
19 |
493,449 |
41.00 |
Soluziona Consultoria y Technologia S.L. |
Development of a Grid Code for Lao PDR
through a Participatory Process Involving Local Stakeholders |
Lao PDR |
12 |
200,000 |
42.93 |
German – Thai Chamber of Commerce |
Strengthening the Capacity of ASEAN Business
to invest under the CDM |
Thailand, Philippines Indonesia |
12 |
81,468 |
49.82 |
Pusat Tenaga Malaysia (Malaysia Energy
Center) |
The PTM Zero Energy Office Building (ZEO
Building) |
Malaysia |
23 |
487,252 |
14.70 |
Riso National Laboratory |
Feasibility Assessment and Capacity Building
for Wind Energy Development in Cambodia, the Philippines and Vietnam |
Cambodia Philippines Vietnam |
22 |
495,567 |
49.71 |
Philippine Council for Industry & Energy
Research & Development – Department of Science & Technology |
Study of the Energy Charter Treaty (ECT)
for Possible Adoption by the ASEAN |
ASEAN countries |
12 |
195,654 |
48.50 |
Institut fur Kreislaufwirtschaft GmbH.
(IKrW) |
Development of practice oriented guidelines
for the preparation of feasibility studies on the production of renewable
energy from organic waste and biomass by biogas plants and biomass
combustion plants, with an applied example for Phu Quoc/S.R. Vietnam
(RENEW) |
Vietnam |
12+2 |
274,322.32 |
50.00 |
Grant amount endorsed EUR 6,426,069.71 and contracted EUR 6,371,476.30.
Current commitment EUR 6,366,583.30.