Installed Capacity in 2000
|
Grid System |
Isolated |
Total |
Percentage (%) |
Installed Capacity (MW) |
1032.57 |
140.73 |
1173.30 |
100.00 |
- Hydroelectric |
327.00 |
32.32 |
360.32 |
30.17 |
- Gas Turbine (23 Units) |
508.10 |
35.89 |
543.99 |
46.37 |
- Steam Turbines |
172.50 |
31.10 |
203.60 |
17.35 |
- Diesel |
24.97 |
40.42 |
65.39 |
5.57 |
Existing Power Stations
|
Installed Capacity (MW) |
I. Hydroelectric Power Stations |
327.00 |
Baluchaung No: 2 Lawpita |
168.00 |
Kinda |
56.00 |
Sedawgyi |
25.00 |
Baluchaung No: 1 |
28.00 |
Zawgyi No: 1 |
18.00 |
Zawgyi No: 2 |
12.00 |
Zaungtu |
20.00 |
II. Gas Turbine Power Stations |
680.60 |
Kyunchaung |
54.30 |
Myanaung |
67.65 |
Shwedaung |
55.35 |
Mann |
36.90 |
Ywama |
66.90 |
Tharkayta GTCC |
91.50 |
Ahlone GTCC |
154.00 |
Hiawga GTCC |
154.00 |
Total: |
1007.60 |
|
|