|
JAMP
PRESSEA |
ASEAN ENERGY AWARDS 2003
New and Renewable
Energy Projects
CATEGORY
|
Category |
No. Of Winners |
|
Off Grid |
1 Regional Winner
1 Runner-Up |
|
On Grid* |
1 Regional Winner
1 Runner-Up |
Note: * - Applicable to utility
grid and local-based grid.
CRITERIA
- Pre-Qualification
The project must be in operation for at
least one (1) year.
- Regional Competition
- Originality
- Design
- Application
- Approach (e.g. multi-sectoral, etc.)
- Environmental And Social
Consideration
- Amount of emissions avoided (CO2,
etc. in tons/year)
- Community / People Participation
- Benefit to user
- Benefit to community
- Benefit to country
- Other features
- Technical, Economic, And Market
Consideration
- Installed capacity
- Technical Design
- Technical Performance
- Investment cost
- Financial scheme / livelihood projects
Funder (Government and Non-Government)
- Market size (potential within the period of 5 years)
- Local Manufacturing / Content of System
- Amount of energy avoided
- Operation And Maintenance Scheme
- Operational hours ( per day/per
month/per year)
- Maintenance scheme (In-house, Contracted out service,
Government, others)
- Other Maintenance measures (training, after-sales service)
- Local service content
- Replicability
- Replicability project
- Life of project
- Cost Effectiveness (No cost, Low cost, High cost
- Sustainability of project
- Others (specify)
DISTRIBUTION OF SCORES
|
No. |
Criteria |
In Percent |
|
1. |
Originality |
10.00 |
|
2. |
Energy & Environmental Consideration |
15.00 |
|
3. |
Technical, Economic, Market And Social
Consideration |
35.00 |
|
4. |
Operating And Maintenance Scheme |
20.00 |
|
5. |
Replicability |
15.00 |
|
6. |
Presentation Of Document |
5.00 |
| |
Total |
100.00 |
FORMAT OF PRESENTATION
Max. 15 pages, A4 size / 12 cpi / Times
Roman
|
No. |
Discussion Areas |
No. of Pages |
|
1. |
Originality |
(Item 1&2) 2 |
|
2. |
Energy & Environmental Consideration |
|
3. |
Technical, Economic, Market And
Social Consideration |
(Item 3-5) 7 |
|
4. |
Operating And Maintenance Scheme |
|
5. |
Replicability |
|
6. |
Figures, Tables, Photo |
5 |
|
7. |
Title Page |
1 |
SUBMISSION
- DEADLINE - 15 May 2003
15 PAGE – SUBMISSION (advanced copy)
must be received by ACE 10 days before the final judging.
- REQUIREMENT
- Endorsement letter from the NRSE-SSN
Focal Point
- Authorization letter from the owner to visit the project
- 10 original copies in a sealed envelope to be brought by the Focal
Points
or may be mailed to the Focal Point of a hosting country.
- MAXIMUM SUBMISSION/COUNTRY: 2 Projects
/ Category
JUDGING / SCORING /
ANNOUNCEMENT OF WINNERS
- One country one vote system.
- Each project will be reviewed
simultaneously by the judges for a period of 30 minutes. Score sheet
may be filled up temporarily within the given period.
- A Judge must not be allowed to
evaluate NRSE project entry/ies that originate from the country that
she/he represents.
- At the end of the judging session, the
judges will be given one hour to review and compare the points given
to each of the project entry. Final score sheet for each candidate
will be placed in an envelope with proper identification of the judges
(name and signature).
- No questions will be entertained during and after the judging
process. Submissions must be judged on the merit of the presentation.
- Individual tally sheets will be tabulated by ACE and two
witnesses, nominated by the Board.
- Final Tally Sheets will be handed over to the Chairman of the
Board, immediately after the individual score sheets have been tallied
bearing the authentic signatures of the ACE representative and 2
witnesses.
- The Chairman of the Board shall report the proceedings of the
judging including the official announcement of winners at the Annual
Meeting of the NRSE-SSN.
PRIZES
- For The Winners : Trophy
and Plaque
- Non-Winners : Plaque
AWARDING CEREMONY
At the ASEAN Energy Awards Nights in
conjunction with the 21st AMEM/SOME, Langkawi, Malaysia, July 2003
|